We have had an opportunity to be part of a new subdivision, currently in progress in West Auckland. From the beginning, this was a difficult project due to the conditions of the site. Alongside Auckland's variable weather forecast at the time, the site was established along large masses of water which had to be strategically re-pumped almost every working day.
Special thanks to TDM Construction Ltd.
High water table conditions throughout the length of the project.
Two of numerous StormLite SW tank installations.
Preparation of 225mm WW junction.
Manhole installation - 4 meter deep, 1200mm.
Raingarden installation - preparation stage
Raingarden installation - finishing stage.